no-image

Quail Creek (Shreveport, Louisiana)

Genesis removed and replaced an abundance of rotten wood on the exterior of all 50 buildings around 400 units at Quail Creek and prepped for paint. We completed a full exterior re caulk and repaint including thousands of feet of metal railing. We also refinished two basketball courts and repaired hundreds of feet of damaged sidewalk. Structural repairs of the leasing office along with a full interior make over by refloating all of the walls and ceilings, new paint, adding new wooden floors along with ceramic tile in the wet areas. We built a dock for the adjoining lake along with other improvements.


Benin-Hangar-Pic

Airplane Hangar & Office Building (Benin, Nigeria)

Genesis has been contracted to design, engineer, procure, ship and construct a 25,000 Sq. Ft. airplane hangar, office building, storage facility and fuel tank facility for a Nigerian government entity. The hangar includes a unique design that can erect in a quick time frame with a membrane cover that reduces heat from UV rays. The office building is two stories at around 4,600 sf including contractor provided furniture, full finish-out, central air conditioning, water tank facilities and a septic system transported from the United States. Construction to be completed by late 2012.


"VFMLID=46950329"

Hyatt (Bridgewater, New Jersey)

A full interior renovation to 128 guest rooms within six buildings that included a tub to walk in shower conversion. We removed all FF&E, carpet, counter tops, tubs, etc. and provided a full interior repaint, new granite tops in all kitchens and baths along with new hardware, installed new carpet, modified the ceilings in the kitchens, built 180 new shower pans with full floor and wall tile replacement along with new glass doors. Installed all new appliances and reinstalled all FF&E. This project was self-preformed at 90%.


Welcome to the DoubleTree at Warren Place - Tulsa's Finest Hotel located in the heart of South Tulsa and a gateway to all the sights and sounds of the fantastic city of Tulsa. Tulsa is known for its warm Midwest hospitality and the DoubleTree at Warren Place has the character to match. The best of Tulsa is just outside our doors from world-class restaurants and museums to fabulous shopping.

Doubletree (Tulsa, Oklahoma)

This project consisted of a complete tear out and renovation of a fitness center; following by a 374 guest bathroom renovation. The guest bathroom renovations included refinishing all bath tubs with a non-slip texture, installing new tile tub surrounds, and installing ADA compliant solutions for grab bars. Scheduling adjustments were made throughout the project to account for the hotel’s high occupancy rates. Genesis self-performed this work 100% with our skilled labor force.


hilton-lafayette_0

Hilton (Lafayette, Louisiana)

Exterior and interior renovation to a 327 room hotel. Interior renovations consisted of replacing all crown molding and base board in all guestroom corridors, refinishing meeting room doors, replacing meeting room carpet, modifying plumbing and installing new granite counter tops and custom wood vanity bases in the guest bathrooms, and installing new flat screen TVs in the guestrooms. In addition, the kitchen ceiling was replaced with new acoustical ceiling tile/grid and new 2×4 electrical lay-in fixtures. All light poles in the parking lot were painted as well.


PBG_2

Marriott (Palm Beach Gardens, Florida)

With this hotel being a high occupancy establishment, Genesis was given a 10 day time line in order to replace and assemble FF&E in 138 rooms. With a myriad of delivery constraints, we were able to accomplish our goal. In addition to assembling 138 rooms, Genesis provided a highly durable, glossy and non-stick finish to all the ground surfaces in the entrance and surrounding the pool.


Marriot_OK_1

Marriott (Norfolk, Virginia)

This project encompassed a diverse scope of work which included carpet repair, millwork, marble repair, vinyl wall covering replacement, carpet replacement, granite refinishing and electrical work. The exterior painting and porte-cochere work for this property was challenging because of an unusually wet season. We were able to delegate our crews to different tasks in order to minimize down time. Because of a consistently high occupancy rate, our crews worked at different hours of the day in order to accommodate the staff and guests.


Marriot_OK_1

Marriott (Oklahoma City, Oklahoma)

While tackling a number of complicated structural issues with the hotel, Genesis was able to find effective and less expensive solutions than other competitors had suggested. A large amount of millwork, painting and flooring (pattered wood matching in lobby and resealing/re-taping of racquetball court) was part of the scope. The hotel had an extremely high occupancy throughout the duration of our work. We were quick to respond to events at the hotel by reorganizing our crews while minimizing noise and debris. This project was self-performed at 95% by Genesis.


lubbock

Holiday Inn (Lubbock, Texas)

Exterior and interior renovations of two Holiday Inns within a five mile radius of each other. Exterior work included large amounts of ADA modifications including welding all exterior stairwells to meet current code. Guestroom renovations included ADA modifications, FF&E, new granite counter tops, sinks, fixtures, and plumbing. Both hotel public space renovations included millwork, ceramic floor tile, granite counter tops, new meeting room doors, vinyl wall covering, carpet, paint, FF&E, etc. All hotel meeting room ceilings were framed, dry walled, and finished as new coffer ceilings. The fitness center was a complete interior build-out by Genesis along with new finishes and custom mirrors. Both hotel restaurants were completely renovated including design/build construction by Genesis of new granite buffets, hostess stations, new electrical panels.


HolidayInn_Lobby

Holiday Inn (Cheyenne, Wyoming)

A full interior renovation to 274 guestrooms, all public spaces and exterior work. Guestroom renovations included new vinyl wall covering, carpet, FF&E, etc. Guest bathrooms received new ceramic tile shower surrounds, vinyl wall covering, FF&E and ADA modifications. The guestroom corridors ceilings where replaced with new suspended acoustical ceiling tile and grid, and new life safety devices. Public space renovations included new vinyl wall covering, carpet, paint, custom millwork, FF&E, ADA modifications, etc. All public area ceilings were replaced with new acoustical ceiling tile and lay-in parabolic light fixtures. The hotel’s registration and restaurant were design/ built by Genesis and completely reconstructed including new ceilings, custom ADA granite counter tops, new wall and floor finishes, and new electrical throughout. The restaurant buffet and serving area was design/built by Genesis as well which included custom granite, and new wall and floor finishes. Daily schedule modification and heavy coordination was a key in accomplishing this scope.