SewellI

Sewell (Dallas, Texas)

A car drove through the service storefront taking out offices and disrupting business. Genesis was on the project within about an hour. We cleaned the broken glass and damaged storefront, built walls in place of the storefront and had them ready for business the next day. We ordered new glass and repaired the storefront including the doors within about 7 days working at night so we did not disrupt the daily business.


no-image

Health South Medical Center (Dallas, Texas)

Health South contracted Genesis to remove all items from one of their hospitals including CT scanner, XRay machines, ER equipment, office furniture, sterilizers, file cabinets, several physical rehab rooms, kitchens, labs, mechanical room and hospital rooms. The property had three buildings that Genesis completed in twelve days.


whole foods

Whole Foods (Dallas, Texas)

A freight elevator was damaged by rolling pallets that broke the back wall loose and clipped a fire sprinkler flooding the loading dock, mechanical room, engineering room, elevator pit, coolers etc. The 480 volt equipment room that powers the elevators was flooded as well. This issue shut the shipping and receiving down for this property so Genesis acted quickly and extracted the water, cleaned the debris, repaired the fire sprinkler and dried the building out putting the elevators back in service along with the coolers and had minimal disruption to the property.


no-image

Kings Gate(Plano, Texas)

Kings Gate had an issue with a large creek that was affecting 13 different properties in the addition by eroding the embankments and starting to encroach on the improvements of the properties. We were contracted to provide the engineering and to build gabion walls and gabion mattresses to protect the property improvements. Some of the walls were over one hundred feet long and fifteen feet tall. We worked with the city of Plano parks department and were able to bring in thousands of cubic yards of material without disrupting the city park or the adjoining neighbors.


no-image

Geo Map (Plano, Texas)

Genesis was contracted to renovate the reception, waiting, dinning, kitchen, administrative rooms and the offices of the Geo Map building. We provided all high end finishes including a heavy texture, faux foe paint, fifty dollar a yard carpet squares with a geometric design etc. We also repaired the skylights above these areas and worked nights and weekends so we had as little disturbance to the regular business day as possible.


no-image

Eagles Landin(Garland, Texas)

This property was affected by a fire. Genesis removed the destroyed/damaged contents, roof shingles, roof deck, engineered trusses, brick, electrical, plumbing, mechanical, drywall, insulation, flooring etc. We protected the property from the elements while the new trusses were being manufactured. The remaining material was treated before we rebuilt. We also built a full playground for this property along with several other improvements.


eastside

Eastside Village (Plano, Texas)

This property is a high end contemporary multifamily/retail mixed use in the heart of old historic downtown Plano. Genesis was contracted to provide a full exterior facelift of all units and all buildings including the parking garage. We created traffic control plans and worked with the city to implement the improvements with little disruption to the residents and the flow of people in downtown. We also completed a full repaint in all corridors/public spaces.


Ladera

Ladera (Fort Worth, Texas)

We removed the wood paneling, trim, insulation and drywall. We replaced the damaged bottom plates along with damaged wall studs and rebuilt with non-batted insulation, moisture resistant drywall after applying a primer to all exposed surfaces. Several plumbing issues were resolved by adding new valves and clearing out old lines. We tape bedded and textured all affected areas along with paint. Installed new base, trim, doors, lighting package, new laminate, VCT, etc.


chaparral

Chaparral (Las Colinas, Texas)

Genesis drained and plastered three of the Chaparral pools along with refinishing the surface of the forth pool. The pool coping cap was also repaired/replaced along with the tile in the pools. The club house underwent a full renovation of all finishes in all areas including a new kitchen. We installed one way mirrors, several flat screen TV’s, granite tops, computer stations, full sound system, hardwood floors, lighting package, several types of doors we installed, refinished the deck, modified the fitness room etc. We also installed R-30 insulation in the attic spaces in all buildings and rebuilt the brick columns in the parking lot.


no-image

Lexington (Plano, Texas)

Genesis was contracted to complete fourteen 2,800 Sq. Ft., high end, new build town homes that were unfinished by the original developer and abandoned for years. We completed a walk and built a specific scope tailored for each unit as each unit was left in a different stage of completion. Genesis worked with the city building department to satisfy issues like insulation inspections that were not called before the drywall was installed and driveway slopes that were too steep. The property required all trades to complete the project and Genesis self-preformed all of them excluding the MEP.