Eagles Landin(Garland, Texas)

This property was affected by a fire. Genesis removed the destroyed/damaged contents, roof shingles, roof deck, engineered trusses, brick, electrical, plumbing, mechanical, drywall, insulation, flooring etc. We protected the property from the elements while the new trusses were being manufactured. The remaining material was treated before we rebuilt. We also built a full playground for this property along with several other improvements.


eastside

Eastside Village (Plano, Texas)

This property is a high end contemporary multifamily/retail mixed use in the heart of old historic downtown Plano. Genesis was contracted to provide a full exterior facelift of all units and all buildings including the parking garage. We created traffic control plans and worked with the city to implement the improvements with little disruption to the residents and the flow of people in downtown. We also completed a full repaint in all corridors/public spaces.


Ladera

Ladera (Fort Worth, Texas)

We removed the wood paneling, trim, insulation and drywall. We replaced the damaged bottom plates along with damaged wall studs and rebuilt with non-batted insulation, moisture resistant drywall after applying a primer to all exposed surfaces. Several plumbing issues were resolved by adding new valves and clearing out old lines. We tape bedded and textured all affected areas along with paint. Installed new base, trim, doors, lighting package, new laminate, VCT, etc.


chaparral

Chaparral (Las Colinas, Texas)

Genesis drained and plastered three of the Chaparral pools along with refinishing the surface of the forth pool. The pool coping cap was also repaired/replaced along with the tile in the pools. The club house underwent a full renovation of all finishes in all areas including a new kitchen. We installed one way mirrors, several flat screen TV’s, granite tops, computer stations, full sound system, hardwood floors, lighting package, several types of doors we installed, refinished the deck, modified the fitness room etc. We also installed R-30 insulation in the attic spaces in all buildings and rebuilt the brick columns in the parking lot.


no-image

Lexington (Plano, Texas)

Genesis was contracted to complete fourteen 2,800 Sq. Ft., high end, new build town homes that were unfinished by the original developer and abandoned for years. We completed a walk and built a specific scope tailored for each unit as each unit was left in a different stage of completion. Genesis worked with the city building department to satisfy issues like insulation inspections that were not called before the drywall was installed and driveway slopes that were too steep. The property required all trades to complete the project and Genesis self-preformed all of them excluding the MEP.


no-image

Quail Creek (Shreveport, Louisiana)

Genesis removed and replaced an abundance of rotten wood on the exterior of all 50 buildings around 400 units at Quail Creek and prepped for paint. We completed a full exterior re caulk and repaint including thousands of feet of metal railing. We also refinished two basketball courts and repaired hundreds of feet of damaged sidewalk. Structural repairs of the leasing office along with a full interior make over by refloating all of the walls and ceilings, new paint, adding new wooden floors along with ceramic tile in the wet areas. We built a dock for the adjoining lake along with other improvements.