A full interior renovation to 274 guestrooms, all public spaces and exterior work. Guestroom renovations included new vinyl wall covering, carpet, FF&E, etc. Guest bathrooms received new ceramic tile shower surrounds, vinyl wall covering, FF&E and ADA modifications. The guestroom corridors ceilings where replaced with new suspended acoustical ceiling tile and grid, and new life safety devices. Public space renovations included new vinyl wall covering, carpet, paint, custom millwork, FF&E, ADA modifications, etc. All public area ceilings were replaced with new acoustical ceiling tile and lay-in parabolic light fixtures. The hotel’s registration and restaurant were design/ built by Genesis and completely reconstructed including new ceilings, custom ADA granite counter tops, new wall and floor finishes, and new electrical throughout. The restaurant buffet and serving area was design/built by Genesis as well which included custom granite, and new wall and floor finishes. Daily schedule modification and heavy coordination was a key in accomplishing this scope.
Author: geccm
Holiday Inn (Billings, Montana)
A full interior renovation to 319 guestrooms, all public spaces and the hotel’s convention center. Guestroom renovations included new carpet, vinyl wall covering, FF&E, ADA compliant bathroom sinks, etc. Public space renovations were based on an extensive PIP list and short deadline from IHG. Genesis performed a large portion of the work as design/build in order to deliver a quality product with minimal down time. Renovations included new ceiling tile, parabolic light fixtures, coffer ceilings, refinishing all meeting room doors/chair rails, ceramic floor tile, new granite registration desk with ADA check in, carpet, vinyl wall covering, FF&E, etc. The hotel’s restaurant received a complete interior demolition and build back. Interior finish out included moving walls, new suspended ceilings, recessed lighting, granite ADA compliant hostess stand and buffet, paint, vinyl wall covering, carpet, etc.
Gulfview (Clearwater, Florida)
We demolished all building materials excluding the original shell on this seven story hotel within twelve days. Exterior build back included steel framing, EFIS, windows, sliding doors, balcony railings, parapet walls, roofing, etc. Interior finish out included metal stud framing, drywall, mechanical, electrical, plumbing, life safety/fire alarm, solid core doors, vinyl wall covering, painting, custom cabinetry/millwork, wet bars, granite countertops, carpet, FF&E, etc. We were faced with many last minute design/build requirements which we implemented seamlessly. Genesis self-performed the job at 70% and completed the building to the highest standards within a five month timeframe.