Holiday Inn (Billings, Montana)

A full interior renovation to 319 guestrooms, all public spaces and the hotel’s convention center. Guestroom renovations included new carpet, vinyl wall covering, FF&E, ADA compliant bathroom sinks, etc. Public space renovations were based on an extensive PIP list and short deadline from IHG. Genesis performed a large portion of the work as design/build in order to deliver a quality product with minimal down time. Renovations included new ceiling tile, parabolic light fixtures, coffer ceilings, refinishing all meeting room doors/chair rails, ceramic floor tile, new granite registration desk with ADA check in, carpet, vinyl wall covering, FF&E, etc. The hotel’s restaurant received a complete interior demolition and build back. Interior finish out included moving walls, new suspended ceilings, recessed lighting, granite ADA compliant hostess stand and buffet, paint, vinyl wall covering, carpet, etc.


Gulfview_during5

Gulfview (Clearwater, Florida)

We demolished all building materials excluding the original shell on this seven story hotel within twelve days. Exterior build back included steel framing, EFIS, windows, sliding doors, balcony railings, parapet walls, roofing, etc. Interior finish out included metal stud framing, drywall, mechanical, electrical, plumbing, life safety/fire alarm, solid core doors, vinyl wall covering, painting, custom cabinetry/millwork, wet bars, granite countertops, carpet, FF&E, etc. We were faced with many last minute design/build requirements which we implemented seamlessly. Genesis self-performed the job at 70% and completed the building to the highest standards within a five month timeframe.